The Summersville Hydroelectric Project uses water released through the dam to generate electricity. The City received a federal license for the project in 1992, and construction began in 1999.
How the project works
Water travels from the dam's outlet structure through a large pipe to a powerhouse. Turbines drive generators, and a transmission line connects the plant with the utility grid.
- A two-unit powerhouse beside the dam.
- A connection to the existing water outlet structure.
- Turbines and generators that convert moving water into electricity.
- Transmission infrastructure connecting generation to the grid.
Engineering and the surrounding area
Project development included design, construction, operating plans, and coordination around the Gauley River. The City's historical project materials also describe environmental and recreational considerations.